DESCRIPTION |
LOCATION |
CONDITION |
---|---|---|
12.9 MW, Two (2) Siemens SGT 400 Gas Turbines, Test Hours Only, 60 Hz and Can Be Converted 50 Hz, Dual Fuel, Warranty | United States | Unused |
125 MW, Two (2) Siemens (701 DU) Gas Turbines, 50 Hz, Dual Fuel, with Warranty, Can Operate on HFO | Europe | Rebuilt |
420 MW Siemens Combined Cycle Power Plant, SGT5-4000F Gas Turbine, SST5 – 5000 Steam Turbine, 50 Hz, Natural Gas, 24,0000 Hours, Complete | Europe | Used |
5.25 MW, Six (6) SGT 100 Zero Hour Rebuilt Gas Turbines, Dual 50 or 60 Hz, Dual Fuel, Warranty | Europe | Rebuilt |
150 MW ISO Siemens Combined Cycle Power Plant, 2 SGT 800 Gas Turbines, 2 x HRSG, 1 SST 400 Steam Turbine, All Auxiliaries, 50 Hz, Natural Gas | Europe | Unused |
12.9 MW, Three (3) Siemens SGT 400 Gas Turbines, Test Hours Only, 60 Hz, Dual Fuel, Warranty Expired | United States | Used |
45 MW, Two (2) Siemens SGT -A45 Gas Turbines, Dual 50-60 Hz, Dual Fuel, 2071, Brand New, Mobile Units | United States | New |
49 MW Siemens SST 400 Steam Turbine, 60 Hz, 13,800 Volt, Never Used, with Warranty | United States | New |
12.5 MW Siemens SST – PAC 300 Steam Turbine, Steam Turbine, Generator, Condenser, Siemens Type S7 Control System, Zero Hours, 50 Hz | Europe | Unused |