100 MW LMS 100 Gas Turbine, 50 HZ, Natural Gas, 2016 Standards, Conversion to Dual Fuel and 60 Hz Possible, Warranty |
United States |
New |
80 MW GE LM 2500 + Combined Cycle Plant, 50 Hz, 11,000 Volt, 2002 Manufacture, 50,000 Hours, Dual Fuel |
Europe |
Used |
60 MW GE LM 6000 Combined Cycle Power Plant, 50 Hz, 2009 Year, 22,000 Hours, Natural Gas |
Asia |
Used |
22.8 MW LM 2500 Gas Turbine, 50 or 60 Hz, 1994 year, Dual Fuel, Rebuilt with Warranty |
United States |
Rebuild |
100 MW LMS 100 Gas Turbine, 60 Hz, Natural Gas, 2016 Standards, Conversion to 50 Hz Possible, Warranty |
United States |
New |
45 MW LM 2500 Power Plant, 2 Gas Turbines of 22.5 MW, Gas/Distillate Fuel Systems, 50 Hz, Dual Fuel, Auxiliaries |
Asia |
Used |
Three (3) LM 2500 Engines Only, 26,600 HP, Liquid Fuel, Enclosures, 2,100 Hours Since Full Overhaul |
Europe |
Used |
LM 6000 PC Gas Turbine, 50 Hz, 11,500 Volt, 2005 Model, Natural Gas, 44,000 Hours |
Asia |
Used |
43 MW LM 6000 PD, 50 Hz, 11,500 Volts, 2007 Manufacture, Natural Gas, 25,000 Hours |
Europe |
Used |
Three (3) 22 MW LM 2500 Gas Turbine, Low Hours, 50 or 60 Hz, Liquid Fuel, But Dual Fuel Available, 90 Day Delivery |
United States |
Used |