35 MW, Two (2) GE TM 2500+ Generation 8 Gas Turbines, 50 or 60 Hz, Dual Fuel, Warranty |
United States |
New |
80 MW GE LM 2500 + Combined Cycle Plant, 50 Hz, 11,000 Volts, 2002 Manufacture, 50,000 Hours, Dual Fuel |
Europe |
Used |
22.8 MW LM 2500 Gas Turbine, 50 or 60 Hz, 1994 Year, Dual Fuel, Rebuilt with Warranty |
United States |
Rebuilt |
45 MW LM 2500 Power Plant, 2 Gas Turbines of 22.5 MW Each, Gas/Distillate Fuel Systems, 50 Hz, Dual Fuel, Auxiliaries |
Asia |
Used |
Three (3) LM 2500 Engines Only, 26,600 HP, Liquid Fuel, Enclosures, 2,100 Hours Since Full Overhaul |
Europe |
Used |
22 MW Each, Three (3) LM 2500 Gas TurbineS, Low Hours, 50 or 60 Hz, Liquid Fuel, But Dual Fuel Available, 90 Day Delivery |
United States |
Used |