GE Frame 6

Gas Turbines

 

DESCRIPTION

LOCATION

CONDITION

42 MW, Six (6) GE Frame 6 B, 2003 Year, Model 6581B, 50 Hz, 11,500 KV, 58,000 Hours Europe Used
Three (3) Frame 6 Gas Turbines, Tri-Fuel, 50 Hz, 11,000 Volts, 2014 Year, No Warranty Europe New
220 MW Frame 6 Combined Cycle Power Plant, Four (4) Frame 6 Model 6541 Gas Turbines, GE 60 MW Steam Turbine, Dual Fuel, 50 Hz, 135,000 Hours Europe Used
32 MW, Three (3) Frame 6 Gas Turbines, 1982 Year, 50 Hz, 11 KV, Dual Fuel, 132,000 Hours Asia Used
Frame 6 Gas Turbine with Auxiliaries, Model 6541, 60 Hz, 13,800 Volts, Natural Gas, Only 9,000 Hours United States Used